Reinforced concrete frame structures

Reinforced concrete frame structures-Horse Constrcution strutcural strengthening

Frame column reinforcement


(1) When the axial compression ratio of the frame column exceeds the specification, it can be wound and reinforced according to the carbon fiber cloth test results, increase the lateral restraint of the column concrete, and improve the deformation performance of the member under the action of seismic load.


(2) Reinforced concrete can be added around the original column according to the actual situation on site and construction conditions to enhance the bearing capacity of the regional frame column.


(3) Retain the original structural column, wrap the steel frame around the column, pour structural glue between the two, and then apply high-strength mortar to the reinforced column outer steel wire mesh.



Frame beam reinforcement


(1) Adopt structural adhesive steel plate shear hoops to reinforce the frame beam, and apply grout on the surface of the steel plate.


(2) For beams where the stirrups at the ends of the main beam do not meet the requirements of the specifications, U-shaped carbon fiber cloth can be pasted on the beam ends to improve the shear resistance.


(3) The non-structural vertical cracks are treated with structural glue infusion and pressure sealing.


(4) Carry out anti-corrosion treatment of steel bars, penetrate through reinforced long ribs, implant U-shaped stirrups, install shear steel brackets and fix them with pull bolts.



Independent foundation


The old independent foundation can be partially retained, the length, width and height can be increased, the concrete cushion at the widened part can be poured, and the reinforcement of the bottom plate should not be damaged. After that, the original foundation was subjected to anti-corrosion treatment of the steel bar and the old concrete interface glue was applied.



Pillar root


The main reinforcement of the pier is implanted around the column and the reinforcement of the pier is tied up. The newly poured concrete in this part should also be coated with the old concrete interface glue. After the concrete is poured, the formwork is removed, the formwork is removed, and the concrete is placed; the formwork is removed and cured.



Floor parts


Paste carbon fiber cloth on the original floor panel and roof panel to reinforce it, carry out anti-corrosion treatment on the bottom of the original floor slab, and perform fire treatment on the surface of the carbon fiber cloth.



Structural connection


For the connection between the original structural beam and the newly added beam body, the main reinforcement bar at the lower part of the secondary beam should be implanted into the original beam body, and supplemented with concrete to ensure the shear strength of the secondary beam, followed by the process of demoulding and maintenance.


Horse Construction Recommended Products

You can find anything here you are in need of, have a trust trying on these products, you will find the big difference after that.

Back
Top
Close